Our development roadmap

A phased build across four operating towers. Milestones shown are targets.

Roadmap

Our development roadmap

A phased build across four operating towers. Milestones shown are targets.

Phase 1 | 2026–2027 — Foundation · Target milestone

2026 — Platform & partnerships

  • Four operating towers launched
  • Global partner engagement across Japan, Korea, Singapore and the USA
  • Institute and state collaborations initiated
  • Talent engines (Mobilise, Manufacture, Deploy) live

Foundation work connects the four towers through a common operating platform. Partner engagement establishes technical scope and contribution areas, while institute and state discussions identify workforce and delivery needs. These are development milestones, not declarations of an operational manufacturing facility.

  1. Phase 1 | 2026–2027 — Foundation · Target milestone

    2026 — Platform & partnerships

    • Four operating towers launched
    • Global partner engagement across Japan, Korea, Singapore and the USA
    • Institute and state collaborations initiated
    • Talent engines (Mobilise, Manufacture, Deploy) live

    Foundation work connects the four towers through a common operating platform. Partner engagement establishes technical scope and contribution areas, while institute and state discussions identify workforce and delivery needs. These are development milestones, not declarations of an operational manufacturing facility.

  2. Phase 1 | 2026–2027 — Foundation · Target milestone

    2027 — Training infrastructure & first JV

    • Hands-on training facilities, labs and cleanroom training environments with academic and state partners
    • First OSAT/ATMP joint venture structured
    • India design centre set up for global semiconductor clients

    The target is to connect training infrastructure, a structured manufacturing partnership and design-centre capability. Technical scope, governance, facilities responsibilities and workforce readiness must be agreed before each workstream progresses. Joint-venture and centre milestones remain subject to the stated approvals.

  3. Phase 2 | 2028–2029 — Build & ramp · Target milestone

    2028 — OSAT/ATMP line start-up

    • Facility build-out with global partner
    • Tool install, process transfer and line start-up teams
    • First Nirji Ready cohorts deployed onto the line

    The build-and-ramp target brings equipment, process transfer and assessed workforce capability into a coordinated start-up plan. Readiness gates should connect facilities interfaces, engineering evidence and local supervision. The milestone is indicative and does not promise an operational line or a production date.

  4. Phase 2 | 2028–2029 — Build & ramp · Target milestone

    2029 — Qualification & volume ramp

    • Customer qualifications, reliability and test capability
    • Design centre scale-up across RTL, verification, physical design and DFT

    Qualification and volume development depend on product requirements and customer-approved evidence. In parallel, the design-centre target broadens engineering disciplines with appropriate technical leadership and access controls. Scale follows readiness; neither qualification nor engineering release is implied in advance.

  5. Phase 3 | 2030–2031 — Scale · Target milestone

    2030 — Multi-state ecosystem

    • Talent ecosystems with multiple states
    • Supplier-ecosystem talent across equipment, gases, water and facilities

    The scale target connects common workforce standards to wider delivery ecosystems. Supplier roles extend readiness beyond the production line to installation, maintenance and facilities support. State participation and delivery capacity require their own agreed scope and evidence.

  6. Phase 3 | 2030–2031 — Scale · Target milestone

    2031 — Advanced packaging & portfolio at scale

    • Advanced packaging capability with partners
    • Integrated OSAT, design and talent platform across India

    The longer-term target is an integrated platform where manufacturing, design, workforce and academia strengthen one another. Advanced packaging depends on technology contribution, equipment and technical validation. Portfolio development remains conditional on partner, customer and regulatory approvals.

Milestones are targets and indicative; they are subject to partner, customer and regulatory approvals.